Installation Instructions: Tree Grates - Paveable
Step 1
Underground preparation / Concrete foundation
Create a gravel or sand bed of approx. 5 cm thickness on a load-bearing substrate and lay the concrete foundation on top. Join the foundation beams with tongue and groove. The foundation must be placed below the upper edge of the covering, reduced by the height of the insertion frame (check for each order). Please make absolutely sure that the foundation is installed level and parallel to the surrounding surface.
Attention:
A traversability of up to 50 kN can only be guaranteed if the system is installed correctly.
Step 8
Paving
Note: Paving of the tree grate can only be done after planting. Please note that these instructions are for guidance only.